Federal Court Dismisses Alucobond ACP Class Action

Federal Court Dismisses Alucobond ACP Class Action

On 27 March 2026, the Federal Court of Australia handed down its judgment in the matter of The Owners – Strata Plan No 87231 v 3A Composites GmbH (No 10) [2026] FCA 351. This significant class action revolved around two aluminium composite panel (ACP) products -...

When Buildings Burn from the Outside

When Buildings Burn from the Outside

The Hidden Risks in Exterior Wall Assemblies In modern construction, we’ve made buildings lighter, more energy efficient, and more visually striking than ever before using exterior cladding or façade systems. These systems include combustible materials like aluminium...

Star Casino Cladding Case

Star Casino Cladding Case

Star Entertainment Sydney v Buildcorp The Star Entertainment Sydney Properties Pty Ltd v Buildcorp Group Pty Ltd trading as Buildcorp Interiors [2026] NSWSC 27 was heard in the Supreme Court of New South Wales and concerned the use of aluminium composite panels (ACPs)...

Tribunal Upholds QBCC Decision in Cladding Dispute

Tribunal Upholds QBCC Decision in Cladding Dispute

Infinity Tower Brisbane - Cladding Body Corporate for Infinity 1 Community Titles Scheme 45404 v Queensland Building and Construction Commission & Anor [2025] QCAT 54 Infinity 1 Body Corporate took the Queensland Building and Construction Commission (QBCC) and...

Grenfell Tower Inquiry: Phase 2 Report

Grenfell Tower Inquiry: Phase 2 Report

Just a few weeks ago, the London Fire Brigade reported that 225 firefighters were sent to an apartment building fire in Dagenham, London. Flames had raced up the side and engulfed the building that was undergoing remedial work to remove non-compliant cladding. This...

Case Study Construction Litigation

Case Study Construction Litigation

Case Study: Building Defects - Cladding Court Case The subject of this case study is a construction litigation case of a mixed-use building in NSW that CJK has been involved with since 2021. The multi-storey building contains a mixture of commercial and retail...

ACP Full or Partial Removal. CJK saves Developer $880,000

ACP Full or Partial Removal. CJK saves Developer $880,000

CASE STUDY: ACP Full or Partial Removal. CJK saves Developer $880,000 A 6-storey building in NSW property with both commercial tenancies and residential apartments received a council notice regarding the Aluminium Composite Panel (ACPs) installed. In 2018, NSW...