Where Experience Meets Creativity

Fire Engineering is a powerful tool that can be applied to new and existing projects. At CJK Fire & Safety we take your concerns seriously. We listen, understand and work closely with our clients to identify compliance options. We believe knowledge is everything, therefore, we take time to explain and educate. No project is too small or too large for us.

Expert Witness Services

Expert Witness Services and Expert Reports

Expert witness services are required in legal matters to assist the Court in making a decision on a claim. We are trained and experienced in providing special expert opinion in building defects and combustible cladding legal matters. We are familiar with the Code of Conduct and confidentiality requirements when it comes to litigation and expert reports.

Fire and Safety Engineering services

Fire Safety Engineering Services

Fire Engineering Performance Solutions

Fire engineering performance solutions are crucial for the current build environment. They allow us to design unique buildings that are safe. At CJK Fire & Safety we use a holistic approach and take time to understand the client’s ideal design. If engaged early, we assist during the design stage and advise on options to overcome compliance hurdles. We are also able to assist when it comes to identified non-compliance issues within existing buildings. This can be due to voluntary upgrades or Council or Fire Brigade notices or Fire Safety Orders. Typical fire engineering designs include extended travel distances to fire exits, compromised fire separation, reduced fire-resistance level, use of combustible materials, installations that vary from tested prototypes, omission of fire safety equipment, locations of fire-fighting equipment, proximity of external walls to fire-source features and much more.

Temporary Fire Safety Strategies

All buildings have approved fire safety strategies when they are completed. During repair or construction works, some elements that form part of the main fire safety strategy may become temporary unavailable. Therefore, it is advised to document and follow a temporary amended fire safety strategy that can be implemented until building works are fully completed. At CJK Fire & Safety we are experienced in developing such strategies for large commercial buildings, office buildings, theaters, and exhibition halls.

Fire Safety Upgrade Strategies for Existing Buildings

Buildings are generally built and designed with a purpose in mind, however over time they often change owners and use. In addition, legislation is amended over time and a building compliant today, may not meet legislative requirements in future. There is no “one-fits-all” solution for existing buildings therefore each of them requires a detailed assessment and a customised approach. Often, the fire separation is not sufficient, or the smoke detection system outdated. Sometimes, a change of use triggers different requirements for external walls and window openings or installation of additional equipment. Whilst compliance with the current version of the Building Code of Australia is not always possible, we ensure that buildings we assess reach and acceptable level of safety. Our previous projects are inter alia, fire safety upgrades due to fire safety concerns raised by Councils and Fire Brigades, changes from a residential use to office and vice versa, building extensions, post-fire upgrades and defects rectifications in aged care facilities and hospitals.

Fire Risk Assessments

Risk is defined as a product of a probability of occurrence and consequence. Fire risk assessments are an important tool to identify areas where fire safety danger is present and mitigate it. Risk assessments are conducted for new and existing developments or can involve analysis for an event or entertainment show. Hereby, we are looking into how likely a fire incident is to occur and if it does, what consequences it could potentially have for the building occupants, fire fighters and the building.

Combustible Cladding Risk Assessments

Combustible cladding installed to external building facades is currently under investigation in worldwide. This is majorly due to installation of combustible aluminum composite panels and combustible insulation to form the external façade, which got involved in large fires in Australia and overseas. Whilst the updated legislation, prohibits the use on non-conforming products on new developments, exiting installations can be subjected to risk assessments to identify areas requiring removal or treatment. CJK Fire & Safety has been conducting risk assessments for all types of buildings using various methodologies accepted within the industry. We have been able to successfully demonstrate that not all cladding needs to be removed and alternative risk mitigation methods are possible. Combustible cladding risk assessments require close collaboration with the project stakeholders, sample testing and development of building-specific fire safety strategies.

Peer Review Reports

Not all projects involving fire engineering are straight forward and hence often project stakeholders will agree to engage and independent fire engineer to review the proposed solutions and provide input to ensure that correct issues have been addressed and that the assessment was done correctly. Clearly, there is always more than one way of developing a design solution, however an independent peer reviewer can assist in improving it. We use peer review guidelines when providing peer review services and see our role as peer reviewer in assisting the project team in finding the most feasible solution for a project.

Training and Seminar services

Fire Safety Training

 

Self-development and education is rated high at CJK Fire & Safety. We always take time when discussing an issue with a client and we advocate for training and professional development. This is why we offer customised fire safety training seminars, online courses and webinars. You will be able to find a list of topics currently available by reviewing our seminar request form.  In addition, please feel free to browse our blog and educational videos.

Request a Seminar

Location Details

Are certificates of attendance required?

Please tick the topics that interest you or identify your own:

RECENT CASE STUDIES

Pacific Hotel Fire in Cairns

Pacific Hotel Fire in Cairns

At CJK Fire & Safety we have been contacted by clients this week asking about the Pacific Hotel Fire in Cairns CBD that occurred in the morning of Sunday, the 28th November 2021. The Police have praised the hotel staff for having facilitated evacuation of 163 people...

Combustible Cladding Risk Assessment

Combustible Cladding Risk Assessment

CASE STUDY Combustible Cladding Risk Assessment Overview – Building Mixed - use building in Sydney, Australia Class 2 (apartments), 7 (carpark) and 6 (retail) Type A Construction Five storeys Existing Fire Engineering Solution Problem Fire Safety Order issued...

Alternative ways of complying with a Council Fire Safety Order

Alternative ways of complying with a Council Fire Safety Order

CASE STUDY Alternative ways of complying with a Council Fire Safety Order How fire engineering can be used on exiting buildings Overview – Building Mixed - use building in Sydney, Australia Class 6 (retail) and 5 (office) Type B Construction Built in 1970s Problem The...

Learn more about Fire & Safety Online Learning options

CJK Fire & Safety has at all times displayed an ongoing commitment to the professional delivery of Fire Engineering services, from early planning through to practical completion, on a wide range of projects that All Construction Approvals has been associated with. Christina is flexible and responsive to Client circumstances and can cope with the demands of various size projects. I have found her to be responsive, insightful, easy to do business with, and genuinely committed to achieving positive outcomes that benefit the project and Client alike..

Harald W.

Certifier

I have no doubt we may well require your services again and will have no hesitation in contacting you as and when required as well as recommending your services along the way

Goran B.

Builder

This is a huge thanks on behalf of Maas Constructions (Dubbo) Pty Ltd for Christina, whose rapid, courteous & professional
assistance got our project back on track, without the need for rework. This has saved or project both time & money. Congratulations on resolving our issue, we truly appreciate your "outside of the box" resolution.
We will certainly be in touch next time we need the services of a Fire Engineer.

James M.

Builder